Foundation treatment for SKIKDA 5 million tons/year condensate project, Algeria 阿尔及利亚SKIKDA500万吨/年凝析

2022.06.30
  • 施工时间 2016年
  • 施工地点 阿尔及利亚
  • 工程类型 石化工程

    Foundation treatment for SKIKDA 5 million tons/year condensate project, Algeria

    阿尔及利亚SKIKDA500万吨/年凝析油项目基础处理

    Concrete pouring pile diameter ø 800mm, pile length 50 m, single pile bearing capacity 6000kN;  The 50,000-ton oil storage tank is treated by vibrio rubble pile, and its bearing capacity is increased from 120kPa to 240kPa. 

    炼厂主厂房混凝土灌注桩桩径Ø 800mm,桩长50 m,单桩承载力6000kN;5万吨储油罐采用振冲碎石桩处理,承载力由 120kPa提高到240kPa。 